Project: Hot Tapping; River Crossing Pipeline Replacement.
Location: Kiboko
Client: KPC
Project Scope:
- Review existing crossing configuration, drawings, survey data, and operating conditions.
- Route and crossing assessment, including hydraulic, geotechnical, and constructability considerations.
- Obtaining required regulatory, environmental, land access, and watercourse crossing approvals.
- Identification and marking of tap location, Excavation and exposure of pipeline.
- Welding of the hot tap fitting onto the live pipe, Inspection NDT, pressure checks.
- Installing the hot tapping machine; Cutting into the live pipeline under pressure and Retrieving the cut Section.
- Leak testing, Commissioning of the new connection.
Project : PS25 Nakuru API 653 out of Service Inspection.
Client: KPC.
Location: Nakuru.
Project Scope.
The inspection included visual examination, condition verification, defect identification, and documentation of maintenance-related observations. Findings highlighted both satisfactory areas and items requiring corrective action prior to recommissioning. Recommendations were issued to ensure compliance, operational safety, and equipment reliability before the system is returned to service.
Project :PS10 API Out of Service Inspection Tank 10TK706
Location: Nairobi.
Client: KPC.
Project Scope:
- Visual Inspection: Examination of external and accessible internal surfaces for corrosion, erosion, cracks, leaks, and mechanical damage.
- Structural Integrity Checks: Assessment of welds, joints, supports, and critical load-bearing components.
- Mechanical Components Review: Inspection of valves, flanges, fittings, seals, and moving parts for wear, alignment, and proper functionality.
- Cleaning and Housekeeping Verification: Evaluation of cleanliness, debris removal, and general maintenance condition.
- Non-Destructive Testing:Ultrasonic testing (UT), magnetic particle testing (MT), and dye penetrant testing (PT).
Project : PS12 KAA Moi International Airport Tank 12TK704.
Location: Mombasa Moi International Airport.
Client: KPC
Project Scope:
- We did atmospheric testing on oxygen levels and presence of toxic gases for safe entry.
- Visual inspection of tank shell, roof, bottom edge, and appurtenances.
- Assessment of corrosion, coating condition, leaks, distortion, and settlement.
- Evaluation of tank foundation, bund wall, and drainage systems.
- Ultrasonic Thickness Testing (UT) of shell, floor, and roof plates.
- Non-Destructive Examination NDE.
- Tank Bottom and Foundation Evaluation.
- Documentation and Compliance.
Project: PS14 API Out of Service Inspection
Client: KPC.
Location: Mombasa.
Project Scope:
- We did atmospheric testing on oxygen levels and presence of toxic gases for safe entry.
- Visual inspection of tank shell, roof, bottom edge, and appurtenances.
- Assessment of corrosion, coating condition, leaks, distortion, and settlement.
- Evaluation of tank foundation, bund wall, and drainage systems.
- Ultrasonic Thickness Testing (UT) of shell, floor, and roof plates.
- Non-Destructive Examination NDE.
- Tank Bottom and Foundation Evaluation.
- Documentation and Compliance.
Project: API Out of Service Inspection.
Client: Kenya Petroleum Refineries LTD.
Location: Changamwe.
Project Scope.
- Visual Inspection: Examination of external and accessible internal surfaces for corrosion, erosion, cracks, leaks, and mechanical damage.
- Structural Integrity Checks: Assessment of welds, joints, supports, and critical load-bearing components.
- Mechanical Components Review: Inspection of valves, flanges, fittings, seals, and moving parts for wear, alignment, and proper functionality.
- Cleaning and Housekeeping Verification: Evaluation of cleanliness, debris removal, and general maintenance condition.
- Non-Destructive Testing: Ultrasonic testing (UT), magnetic particle testing (MT), and dye penetrant testing (PT).
Project: API 653 Out of Service Inspection and Non-destructive Testing.
Client: Chevron Kenya LTD.
Location: Mombasa.
Project Scope:
- Conducted atmospheric testing on oxygen levels and presence of toxic gases for safe entry.
- Visual inspection of tank shell, roof, bottom edge, and appurtenances.
- Assessment of corrosion, coating condition, leaks, distortion, and settlement.
- Evaluation of tank foundation, bund wall, and drainage systems.
- Ultrasonic Thickness Testing (UT) of shell, floor, and roof plates.
- Non-Destructive Examination NDE.
- Tank Bottom and Foundation Evaluation.
- Documentation and Compliance.